Project Experience

Kwinana Freeway Widening

Scope

Working within a live Freeway situation to deliver full electrical package, including switchboards, pit & pipe and streetlighting

Solution

Delivered above Tier 1 expectations prompted a promotion onto pricing competitors variation works in other areas of project. Praise from Main Roads in the creation of 3 x Aboriginal Electrical Apprenticeships.

Kalbarri Skywalk National Park

Scope

Supply and installation of 80kWh battery storage, 40kW of solar PV energy production and fully automated 10kV backup generator.

Solution

Supplied and installed 80 kwh battery storage and 40 kw of Solar PV panels to supply all power requirements for the newly constructed cafe as well as lighting for the Parks 2 x 25 meter high skywalks.

Department of Immigration and Border Protection, Perth

Scope

Armoury security, electrical and lighting + four level refurbishment inclusive of electrical, lighting, Cat 6A communications and Type 1A Gallagher security system.

Solution

Wilco Electrical delivered a electrical and communications upgrade, which included delivery of one of the first Gallagher Class A Security Systems in WA, covering three levels including a new Armoury.

NorthConnex Tunnel E&I designing, commissioning and operation Support

Scope

Tasked with managing the commissioning of tunnel services, this team was distributed along the surface, tunnel and at the Motorway Control Centre.

Solution

RSGx's integrated approach in the design and commissioning phases provided well-structured workflow and more productive programming from energisation to handover. This project was successfully completed and included mobilisation of just over 200 personnel.

Solar PV for Main Roads Engineering Branch

Scope

Supply and install 100kW Solar PV monitored system.

Solution

Wilco Electrical was engaged to provide a renewable energy solution and designed and installed a 99.3KW Solar PV system. Delivered in a challenging, operational environment, the project was delivered with zero impact on Main Roads operations.

Statewide flagpole project

Scope

Project management & scheduling, design, supply & install of concrete free flagpole system.

Solution

Kardan Construction was awarded the project for $1.2M with feedback confirming the next closest price was $2M. Kardan was able to successfully deliver this project through technology innovations and creative thinking.

Wheatbelt police stations upgrades

Scope

Install new security glazing, walls & ceilings, modify cabinetry, painting, locks and hardware upgrades.

Solution

These Wheatbelt station upgrades delivered multiple sub-contracting opportunities to two Aboriginal businesses. Two emails received with praise from two separate Station Sergeants regarding excellent communication, tidiness and efficiency to deliver minimal disruption.

West Australian Police (20 Sites)

Scope

Supply and installation of Solar PV, LED lighting and zero mass water source units.

Solution

Kardan Construction and Wilco Electrical have consistently delivered fit outs complimented with renewable energy and water technologies. All of these projects have an excellent track record for not only being on time and on budget but also the creation of apprenticeships for Aboriginal and Torres Strait Islander peoples.