Solar PV for Main Roads Engineering Branch
![Solar PV for Main Roads Engineering Branch](https://uploads-ssl.webflow.com/5f02702eb118050e363ec415/612c6fccf19ce5786544f824_Solar%20PV%20for%20Main%20Roads%20Engineering%20Branch.png)
Scope
Supply and install 100kW Solar PV monitored system.
Solution
Wilco Electrical was engaged to provide a renewable energy solution and designed and installed a 99.3KW Solar PV system. Delivered in a challenging, operational environment, the project was delivered with zero impact on Main Roads operations.